gday ksr
if you went for a round option, drilled 40mm into the top & bottom rails at 150 centres...
1500/150 = 11, x 3 levels = 33 lengths at 1000 - 100 (top) - 100 (bottom) = 800; or about 27 metres overall
i notice you mention total of 9 l.m's so im guessing your handrails are 2x 1500 long, therefore 27 becomes 54. this option may be priced competetively with the square members being fixed, would require less cost in terms of fixings but probably more time doing the fixing.
food for thought, r's brynk |