Thread: Replacing A single floor board

  1. #1
    BigCal is offline Senior Member
    Join Date
    Oct 2007
    Location
    Saratoga, NSW
    Posts
    111

    Default Replacing A single floor board

    Hi Everyone,

    I pulled the tiles up in the kitchen this weekend and found a couple of things that need attention before the floor can be sanded for polishing... one of which is a board that has split and has had a repair done to it by nailing a thin strip of metal over the top of it...

    I remember seeing on here a thread where someone described in detail how best to get a section of a floor board out and put a new one in, i remember you have to remove the bottom of the groove but thats about it... I've spent an hour searching and can't find the thread again... If someone happens to have a link to it, or if someone can describe the process againt hat would be greatly appreciated...

    Cheers
    Callum

  2. #2
    weisyboy's Avatar
    weisyboy is offline Senior Member
    Join Date
    Apr 2006
    Location
    upper brookfield brisbane australia the earth
    Posts
    110

    Default

    ok its fairly simlple

    to remove the old board

    1. drill a hole at either end of the damaged area.
    2. cut across the board with a jig saw or similar (make sure it is square)
    3. cut along the length of the board (to make it into 2 peices)
    4. simply lif teach pice out or push them threw underneath.
    to install the new board

    1. check the width in older houses the boards were often a diferent size used now so you might have to go to a demolisher or timber recycler to get a new board
    2. cut the board to exactly the right length.
    3. sand or file a slight tapper on either end so it will slip in easily.(they can be cut on a angle to start with
    4. remove the bottom edge of the grove side.(you can also remove the tung if you wish)
    5. place the new board on the floor next to the hole.
    6. lift the grove side slightly and slide it into the hole.
    7. push the tung into the grove in the existing board.(this dosent matter if you removed the tung) tap with a hammer if it wont go easily
    8. once the tung is located push down on the grove side untill it is flush with the floor. (tap with hammer if necisary)

    if you dont understand any of these steps then please let me know n i will explain better.
    Regards: Carl
    People in mud brick houses shouldn't do the rain dance.
    craftimber Carl: 0423 893 590 carlweiss@bigpond.com

    All Welcome in my workshop, click here

  3. #3
    BigCal is offline Senior Member
    Join Date
    Oct 2007
    Location
    Saratoga, NSW
    Posts
    111

    Default

    Cheers, that all sounds pretty straight forward, much appreciated

  4. #4
    weisyboy's Avatar
    weisyboy is offline Senior Member
    Join Date
    Apr 2006
    Location
    upper brookfield brisbane australia the earth
    Posts
    110

    Default

    no probs.
    it is realy easy

    just make sure you make it the right length and dont split the grove on the other board.
    Regards: Carl
    People in mud brick houses shouldn't do the rain dance.
    craftimber Carl: 0423 893 590 carlweiss@bigpond.com

    All Welcome in my workshop, click here

  5. #5
    chrisp's Avatar
    chrisp is offline 2K Club Member
    Join Date
    May 2004
    Location
    Melbourne, Australia
    Posts
    2,556

    Default

    weisyboy has explained it quite well but don't forget the cleats. It is usual to cut the faulty board off flush with the floor joist at each end and nails cleats to the floor joists to support the ends of the replacement board.

  6. #6
    Dusty's Avatar
    Dusty is offline A1 FLOOR SANDER
    Join Date
    Dec 2003
    Location
    Frankston-Langwarrin VIC
    Age
    50
    Posts
    759

    Default

    This might help in some way.
    Attached Thumbnails Attached Thumbnails cffs-repairs-3-medium-.jpg   cffs-repairs-medium-.jpg   cffs-repairs-4-medium-.jpg   cffs-repairs-1-medium-.jpg   cffs-repairs-2-medium-.jpg  


  7. #7
    weisyboy's Avatar
    weisyboy is offline Senior Member
    Join Date
    Apr 2006
    Location
    upper brookfield brisbane australia the earth
    Posts
    110

    Default

    i forgot to mention that.

    it is best to cut of each board flush with the joists and chisel so that a little bit away so the end sits on the joist
    Regards: Carl
    People in mud brick houses shouldn't do the rain dance.
    craftimber Carl: 0423 893 590 carlweiss@bigpond.com

    All Welcome in my workshop, click here

  8. #8
    BigCal is offline Senior Member
    Join Date
    Oct 2007
    Location
    Saratoga, NSW
    Posts
    111

    Default

    Thanks for the pics Dusty and the other tips, I'll give it a go at lunch time today... will post a pic of my disaster once im done... hehe

  9. #9
    BigCal is offline Senior Member
    Join Date
    Oct 2007
    Location
    Saratoga, NSW
    Posts
    111

    Default

    Jobs done... spot the replaced board... thanks for all your help, those pics were particulary good thanks Dusty...

    Its a bit creaky so i might beef up the supports by the 2 end joists, the board is only just on them because of where the nails were... Also the top of the groove on the black board on the bottom side of the replace ment cracked and came away, annoying but not the end of the world the floor is old-ish cypress and as I am preparing the floor i can already see its going to need a bit of filler....

    Man that black tar stuff stunk when using the circular saw, had to put a mask on...

    Thanks again
    Attached Thumbnails Attached Thumbnails replacementboard.jpg  

  10. #10
    namtrak's Avatar
    namtrak is offline In with the new
    Join Date
    May 2001
    Location
    Albury and Canberra
    Age
    49
    Posts
    721

    Default

    Exactly what I needed. I am currently matching in some boards on a floor - and I am having a problem with the long cut up the boards. The cut pieces are pushing down and jamming the blade - I think I need to make sure the base of the circular saw sits across the stable boards either side? Or maybe make the cut a bees dick short of the depth of the board and just break it after the cut has finished?

  11. #11
    Gaza is offline Hammer Head - 1K Club Member
    Join Date
    Jan 2005
    Location
    Sydney
    Posts
    1,607

    Default

    hey,

    just take it slow when cutting you dont wnat the saw to jam and kick back.

    It happened to me once and i ended up having to change about 6 boards. that was a pain in the BUTT.

    i normal use a festool plunge saw to do this these days it makes nice clean cuts and the rail keeps it straght.

  12. #12
    namtrak's Avatar
    namtrak is offline In with the new
    Join Date
    May 2001
    Location
    Albury and Canberra
    Age
    49
    Posts
    721

    Default

    Thanks for the advice, took it easy and didn't panic - all looks good so far.

    Finished photos to come.
    Attached Thumbnails Attached Thumbnails img_4368-1.jpg  

Similar Threads

  1. Replacing a single brick
    By emptybucketman in forum BRICKWORK
    Replies: 19
    Last Post: 3rd Mar 2008, 01:47 PM
  2. Gap between floor and plaster board
    By krakatoa in forum DOORS, WINDOWS, ARCHITRAVES & SKIRTS ETC
    Replies: 10
    Last Post: 1st Nov 2007, 11:15 AM
  3. Replacing single-glaze with double-glaze
    By zok in forum DOORS, WINDOWS, ARCHITRAVES & SKIRTS ETC
    Replies: 3
    Last Post: 17th Apr 2007, 03:11 PM
  4. Floor board replacement
    By ozjames in forum FLOORING
    Replies: 8
    Last Post: 22nd Jul 2006, 07:02 PM
  5. Replacing sub floor?
    By lash in forum FLOORING
    Replies: 8
    Last Post: 15th Nov 2004, 09:37 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •