    Default Tiling Floor or Walls First

    HI All,

    I am about to tile my bathroom and would like to know whether I should be tiling the floor or walls first.

    Thanks
    Macmen

  2. #2
    Senior Member
    Join Date
    Jun 2007
    Location
    Adelaide
    Posts
    391

    Default Walls first

    I would tile the walls first but leave the bottom row of wall tiles off until the floor is finished. This way you will not get gunge on the floor tiles. You can then cut your bottom row of wall tiles to suit the finished floor level and seal the joint between wall tiles and floor tiles with silicon.

    Cheers
    Juan


    "If the enemy is in range, so are you."

  3. #3
    Golden Member Gooner's Avatar
    Join Date
    Nov 2007
    Location
    Melbourne
    Age
    39
    Posts
    865

    Default

    What Juan said...

    I may be wrong, but I have a feeling that it is done this way by professional tilers simply for the "speed" factor. I.e the most of the walls and all the floors could be done the same day using this method. Probably the same thing to do the floors first, but then you would have to wait for the adhesive to dry before you could do the walls.

    So really, it seems the short answer is, floors first.

    I am also about to tile my bathroom. I will be doing the walls first minus the bottom row. The only thing I'm unsure of is how to fix a batten in place as a horizontal reference for the tiles. I have waterproofed most of the walls and so I dont want to be nailing in reference battens in the walls for the row of tiles. Have to find a solution to this.

  4. #4
    Member
    Join Date
    Aug 2006
    Location
    Albury
    Posts
    90

    Default

    I did as Juan has described. Used a batten as a reference for the first row of wall tiles. Did the floor. removed batten & put a little silicon in the nail holes punched thru the waterproof membrane. I can't see why that wouldn't work.
    Cheers,

  5. #5
    Senior Member
    Join Date
    May 2008
    Location
    Brisbane
    Age
    37
    Posts
    219

    Default

    Quote Originally Posted by juan View Post
    I would tile the walls first but leave the bottom row of wall tiles off until the floor is finished. This way you will not get gunge on the floor tiles. You can then cut your bottom row of wall tiles to suit the finished floor level and seal the joint between wall tiles and floor tiles with silicon.
    Cheers


    The wall tiles should come down and over the floor tiles. Like Juan said, it's much easier to get that final wall tile in place, than sliding in the floor tile...

  6. #6
    Golden Member GraemeCook's Avatar
    Join Date
    Apr 2006
    Location
    Hobart
    Posts
    814

    Default

    Hi All

    I did the reverse in our bathroom - I put in the terra cotta floor tiles first, sealed them, and then did the ceramic wall tiles. This means that the floor tiles go under the wall tiles about 6.5mm. My rationale for doing it this way was that I thought it better for moisture running down the walls to land on floor tiles, rather than land on the grout between the floor and wall tiles.

    After ten+ tears it still seems the right decision.

    Cheers

    Graeme

  7. #7
    Golden Member Gooner's Avatar
    Join Date
    Nov 2007
    Location
    Melbourne
    Age
    39
    Posts
    865

    Default

    Quote Originally Posted by GraemeCook View Post
    Hi All

    I did the reverse in our bathroom - I put in the terra cotta floor tiles first, sealed them, and then did the ceramic wall tiles.

    Graeme
    It's the same thing. What everyone else described is kinda like doing the floors first, but you have the advantage of being able to tile almost the entire room in one day.

    Leaving the bottom row of wall tiles as the last step means they will sit on top of the floor tiles, just as you have done.

  8. #8
    Owner Builder
    Join Date
    May 2007
    Location
    Altona Vic
    Posts
    296

    Default

    I've done 2 bathrooms, and the first time I did the walls first, 2nd time did floor first. Working alone in the evenings, it was never an issue of the quickest option of doing the whole room in one go, so that removed one reason for doing walls first. In summary, I found it much less fiddly to do the floor first. It made for a very neat result on the bottom row of wall tiles. However, I can see good reasons for both methods.

  9. #9
    Apprentice (new member)
    Join Date
    Nov 2008
    Location
    Williamstown
    Posts
    19

    Default

    My tiler is doing my bathroom at the moment, and he's done the walls first, complete to the floor. I guess as long as it's siliconed at the border there shouldn't be an issue, and he's waterproofed the entire floor and wall skirt area. Must be easier for him.


Similar Threads

  1. Painting walls before floor sanding
    By sibbu in forum Painting
    Replies: 6
    Last Post: 3rd Jul 2008, 06:34 PM
  2. Replies: 10
    Last Post: 31st Mar 2008, 07:46 PM
  3. Floor tiling over tiling
    By SkyHook in forum Tiling
    Replies: 2
    Last Post: 25th Mar 2008, 10:05 PM
  4. Floor tiling help
    By SkyHook in forum Tiling
    Replies: 2
    Last Post: 23rd Mar 2008, 04:53 AM
  5. new floor progress, pt 2 - walls and ceiling now too!
    By Moo73 in forum Structural Renovation
    Replies: 0
    Last Post: 16th Aug 2005, 01:18 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •