    3 years ago I started excavating under my house to create a workshop/man cave.

    I planned the work in 3 major stages, the first 2 of which are complete.

    I have removed over 50 tonne of earth by hand, spanned out 25 brick piers and installed a substantial amount of structural steel with only the the help of friends to lift steel and a few of the slow days at work spent under there with the apprentice digging.

    I took a year off after completing stage 2 following the birth of my son.

    Workshop is in and functioning but the lure of almost doubling my work area has tipped me over the edge.

    Stage 3 has begun and involves the excavation work at the deepest side of the house, there is 3 brick nib walls 2.5M long here supporting what was the laundry and is still the bathroom and the toilet.

    to gain the ceiling height i desire stage 3 also en tales excavation of more than 500mm below the bottom of the strip footing along the back wall. (my current plan is to leave 1M of the earth at the back wall to maintain the integrity of the footing but am open to suggestions).

    I would love some advice on supporting the bath/toilet slabs both temporarily and permanently

    The pictures will tell more than I can

  2. #2
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    How do I upload pics?

  3. #3
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    renovate1.jpg

    This is the day I moved in looking back into the area to be excavated

  4. #4
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    renovate2.jpgrenovate3.jpgthis was the end of stage 1,first 4 piers removed, 2 x 250UB25 in place of existing timbers and concrete floor poured

  5. #5
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    stage 2 earthworks complete, several months spent here
    Attached Thumbnails Attached Thumbnails renovate4.jpg   renovate5.jpg   renovate8.jpg   renovate7.jpg  

  6. #6
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    renovate9.jpgall steel in stage 2, leveling for concrete

  7. #7
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

  8. #8
    2K Club Member
    Join Date
    Apr 2012
    Location
    Jarrahdale
    Posts
    2,094

    Default

    Hey Admin..

    Link to a YouTube video on how to upload photos onto here...

    https://youtu.be/3ECEVV0rywY

  9. #9
    1K Club Member paddyjoy's Avatar
    Join Date
    Sep 2011
    Location
    Sydney
    Posts
    1,577

    Default

    Can't help with your question but just wanted to say it's looking good, massive job!

  10. #10
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    Cheers, I love every minute of it

  11. #11
    1K Club Member
    Join Date
    Jul 2009
    Location
    Tasmania
    Posts
    1,577

    Default

    I hope you have had engineering advice .....

  12. #12
    ℱᎾℛUℳ ℂℒᎾᏇℕ PlatypusGardens's Avatar
    Join Date
    Oct 2011
    Location
    W👀MBYE
    Posts
    8,624

    Default

    Good grief.

    that's a lot of digging
    Accident free since yesterday



  13. #13
    4K Club Member OBBob's Avatar
    Join Date
    Jan 2006
    Location
    Melbourne
    Posts
    7,077

    Default Under floor excavation for workshop/mancave

    Quote Originally Posted by David.Elliott View Post
    Hey Admin..
    Is there still an Admin? Lol.

  14. #14
    4K Club Member OBBob's Avatar
    Join Date
    Jan 2006
    Location
    Melbourne
    Posts
    7,077

    Default

    Amazing effort digging...

  15. #15
    1K Club Member havabeer's Avatar
    Join Date
    Nov 2011
    Location
    nsw
    Posts
    1,040

    Default

    i'm wanting to do something similar to my house actually, except i won't be moving 50 tons by hand...

    how do you plan on retaining the dirt and footings?

  16. #16
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    renovate12.jpgrenovate11.jpgafter the slabs were down we drilled and chemset in starter bars, layed the blocks then filled with concrete and then aggregate behind the wall.. very solid

  17. #17
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    2015-03-04-15.45.13.jpg

  18. #18
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    I used the retailing wall loss of space to create the main work benchrenovate14.jpg

  19. #19
    1K Club Member Godzilla73's Avatar
    Join Date
    Dec 2010
    Location
    Legoland
    Posts
    1,291

    Default

    Looking good, what's the head height like?
    I had a life, but my job ate it...

  20. #20
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    Perfect for me, I'm 6 foot 3 and can walk under the uni beams without contact. Gave myself 10mm clearance

  21. #21
    1K Club Member Spottiswoode's Avatar
    Join Date
    Sep 2015
    Location
    Lake Macquarie
    Posts
    1,009

    Default

    Quote Originally Posted by Refgies View Post
    Perfect for me, I'm 6 foot 3 and can walk under the uni beams without contact. Gave myself 10mm clearance
    Best keep your high heels for going out then
    Measure twice, cut once, trim some off the end, trim some more. Too short. Rinse, Repeat.

  22. #22
    Tomo
    Join Date
    Jun 2010
    Location
    melbourne
    Posts
    14

    Default

    Nice work so far...I'm also having a go at digging under my place....how did you go with permits and engineering?

  23. #23
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    Permits not required as I am expanding storage space, the area is no habitable.
    I had an engineer draw up steel size requirements and maximum spans etc.
    I just take photos of my footing depths and he is happy.

  24. #24
    4K Club Member Marc's Avatar
    Join Date
    Jul 2003
    Location
    Sydney
    Posts
    13,914

    Default

    So the council asks for a development application for a carport and nothing for underpinning the whole house?
    Hard to believe
    PS
    What happens if God forbid, a beam or pier gives way and you need to claim insurance?
    Enjoy present pleasures in such a way as not to injure future ones.
    Seneca

  25. #25
    1K Club Member havabeer's Avatar
    Join Date
    Nov 2011
    Location
    nsw
    Posts
    1,040

    Default

    i thought you had to get DA's if your excavating closer then 1m of your footings

  26. #26
    Tomo
    Join Date
    Jun 2010
    Location
    melbourne
    Posts
    14

    Default

    I like it...wonder if my council in Melbourne are open to the same regs?

  27. #27
    4K Club Member OBBob's Avatar
    Join Date
    Jan 2006
    Location
    Melbourne
    Posts
    7,077

    Default

    Quote Originally Posted by hrt22 View Post
    I like it...wonder if my council in Melbourne are open to the same regs?
    All works have to happen at night, without the use of powered machinery ...

  28. #28
    Apprentice (new member)
    Join Date
    Jul 2012
    Location
    Melbourne
    Posts
    13

    Default

    So how did you get rid of all the dirt? That would be a lot of money in skips.

    Around here (melbourne) a 4 meter skip costs around 350, so 50 cubic meters would be around $4200.

  29. #29
    Apprentice (new member)
    Join Date
    Oct 2013
    Location
    Northern BEaches Sydney
    Posts
    14

    Default

    I was waiting for someone to ask that..

    I am a sparky and the main wholesaler I use offers a skip bin to customers for rubbish disposal.
    They also have a huge amount of empty boxes on offer.
    Every day I would fill 8-10 boxes of earth (the boxes had to be re inforced with packing tape) and put them in the bin. The owners of the wholesaler didn't care as the bin was rarely full at pick up time and the cost was the same to them either way. I also weighed every box before loading into the van.
    I got rid of around 50 tonne over 1.5 years in that bin.
    At the end of the dig I had to use 4 skips at 8 tonne a peice (cost 500$ each)

    For the stage I am currently undertaking I have a more convenient way of dumping the soil via a friend semi near by with acreage and my ute

  30. #30
    4K Club Member OBBob's Avatar
    Join Date
    Jan 2006
    Location
    Melbourne
    Posts
    7,077

    Default Under floor excavation for workshop/mancave

    You're not related to that 'great escape' guy are you?

  31. #31
    Apprentice (new member)
    Join Date
    Jul 2012
    Location
    Melbourne
    Posts
    13

    Default

    "to gain the ceiling height i desire stage 3 also en tales excavation of more than 500mm below the bottom of the strip footing along the back wall. (my current plan is to leave 1M of the earth at the back wall to maintain the integrity of the footing but am open to suggestions)."

    I've seen youtube videos of companies (US) that do underpinning around the perimeter of a building from inside. They dig out a 1 metre (or thereabouts) section under the footings, put metal bars in, box it all up then concrete it.
    Once it has set they move onto the next section.

    Not sure how they manage to waterproof it all though - perhaps they dig from outside later and put in a dampproofing membrane and drainage.

    There is a guy in Sydney who has done something similar for his townhouse. Apparently he managed to do it without affecting the neighbours walls at all.

  32. #32
    1K Club Member paddyjoy's Avatar
    Join Date
    Sep 2011
    Location
    Sydney
    Posts
    1,577

    Default

    Quote Originally Posted by Refgies View Post
    I was waiting for someone to ask that..

    I am a sparky and the main wholesaler I use offers a skip bin to customers for rubbish disposal.
    They also have a huge amount of empty boxes on offer.
    Every day I would fill 8-10 boxes of earth (the boxes had to be re inforced with packing tape) and put them in the bin. The owners of the wholesaler didn't care as the bin was rarely full at pick up time and the cost was the same to them either way. I also weighed every box before loading into the van.
    I got rid of around 50 tonne over 1.5 years in that bin.
    At the end of the dig I had to use 4 skips at 8 tonne a peice (cost 500$ each)

    For the stage I am currently undertaking I have a more convenient way of dumping the soil via a friend semi near by with acreage and my ute
    Love it!

    Quote Originally Posted by ColBatGuano View Post
    "to gain the ceiling height i desire stage 3 also en tales excavation of more than 500mm below the bottom of the strip footing along the back wall. (my current plan is to leave 1M of the earth at the back wall to maintain the integrity of the footing but am open to suggestions)."

    I've seen youtube videos of companies (US) that do underpinning around the perimeter of a building from inside. They dig out a 1 metre (or thereabouts) section under the footings, put metal bars in, box it all up then concrete it.
    Once it has set they move onto the next section.

    Not sure how they manage to waterproof it all though - perhaps they dig from outside later and put in a dampproofing membrane and drainage.

    There is a guy in Sydney who has done something similar for his townhouse. Apparently he managed to do it without affecting the neighbours walls at all.
    "Ourbuild" did that to his place and has some pictures of it in his post http://www.renovateforum.com/f176/ma...vation-112896/

  33. #33
    1K Club Member
    Join Date
    Feb 2007
    Location
    Sydney
    Posts
    1,272

    Default

    When I dug the footings for the retaining wall in the back room of the garage, I filled 20L buckets with the dirt.
    Put 2 of them in my weekly bin, and one in each of the neighbours. Took about 6 months to finish those footings!

  34. #34
    4K Club Member Marc's Avatar
    Join Date
    Jul 2003
    Location
    Sydney
    Posts
    13,914

    Default

    If only houses in Australia had cellars and attics from the start
    Enjoy present pleasures in such a way as not to injure future ones.
    Seneca

  35. #35
    4K Club Member OBBob's Avatar
    Join Date
    Jan 2006
    Location
    Melbourne
    Posts
    7,077

    Default Under floor excavation for workshop/mancave

    Quote Originally Posted by commodorenut View Post
    When I dug the footings for the retaining wall in the back room of the garage, I filled 20L buckets with the dirt.
    Put 2 of them in my weekly bin, and one in each of the neighbours. Took about 6 months to finish those footings!
    Lol... at some point it just becomes a bit (I'm not sure the polite word? ). Anyway, the point being doesn't that only work out to about 2 cubic metres?

    That said, good use of rubbish storage that was probably always unoccupied.

  36. #36
    Apprentice (new member)
    Join Date
    Jul 2012
    Location
    Melbourne
    Posts
    13

    Default

    Quote Originally Posted by commodorenut View Post
    When I dug the footings for the retaining wall in the back room of the garage, I filled 20L buckets with the dirt.
    Put 2 of them in my weekly bin, and one in each of the neighbours. Took about 6 months to finish those footings!
    We hardly put anything in our bin, so I've started filling it up with dirt. I can get around 100 litres/fortnight = 2.6m^3 a year. That'd make 20 years to remove OP's dirt!

  37. #37
    4K Club Member OBBob's Avatar
    Join Date
    Jan 2006
    Location
    Melbourne
    Posts
    7,077

    Default

    Wow, in our area the trucks have weight measurements in the lifters and won't take it if it's too heavy... we wouldn't get away with filling with dirt.

  38. #38
    1K Club Member
    Join Date
    Feb 2007
    Location
    Sydney
    Posts
    1,272

    Default

    ^^ That's why it was only 2 buckets maximum! Never had an issue.

    Previous owner had dug out a room behind the garage. He had a little crawl-hole to get in there.
    When we moved in, I cut a doorway into the non-bearing brick wall at the end of the garage, to allow better access.

    He'd dug a fair bit out, and replaced 2 piers with poles. He stopped short of going as far as the next row of piers, and simply "rendered" the 1200mm high shale & clay mound that remained.
    Problem was the "render" was only about 20mm thick, and after a year it began to crack & allow mini-landslides.

    So I dug out along in front of it & built a core-filled bessa-block retaining wall to hold it all back. With reo in every hole, and 100% core filled, that wall will outlast the house!

Similar Threads

  1. Man Cave construction - Sub-Floor excavation
    By Ourbuild in forum Go to Whoa!
    Replies: 28
    Last Post: 1st Apr 2015, 11:44 AM
  2. Mancave Refresh
    By nathan29 in forum Go to Whoa!
    Replies: 18
    Last Post: 10th Aug 2013, 07:26 PM
  3. Wood floor for a workshop
    By Harry72 in forum Flooring
    Replies: 12
    Last Post: 3rd Feb 2009, 03:58 PM
  4. Sub Floor Excavation
    By Miles in forum Structural Renovation
    Replies: 10
    Last Post: 19th Jul 2007, 10:42 PM
  5. Paint/sealer for workshop floor?
    By JDub in forum Painting
    Replies: 4
    Last Post: 30th Nov 2006, 02:40 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •