    Default in which order?

    Hi guys,

    I am about halfway through a full house reno...I have posted in other threads about it but basically it is a 1940's house in original condition which we have gutted and are renovating.

    We are currently about halfway through, plaster is all hung, but I am a bit stuck about which order we should go about doing things in the bathroom.

    We have had everything re-plumbed, so the bathroom is fully roughed in. We had to replace / re-inforce some of the joists in the sub floor, and have just got the cement sheeting layed and the plastering has been done.

    My father in law wants to water proof and caulk (he has some experience in this) but we are getting a professional tiler in.

    Do we waterproof now, before tiling and screeding? or after?

    Also, we will be installing a frameless shower screen, are these installed before tiling or after?

    Sorry if these are really stupid questions, although we have learnt a lot over the past 8 months we are still total newbies compared to some!

    thanks for reading

    Maryanne

  2. #2
    Novice
    Join Date
    Jan 2011
    Location
    Perth
    Posts
    32

    Default

    Hahaha, of course you waterproof before tiling unless you want paint all over your tiles. :P It will be done between screeding and tiling.

    Also, the shower screen will be installed after all the tiling is done so that the measurements are done perfectly.

  3. #3
    3K Club Member
    Join Date
    Jun 2010
    Location
    Qld
    Posts
    3,278

    Default

    Quote Originally Posted by PVS View Post
    Hi guys,

    I am about halfway through a full house reno...I have posted in other threads about it but basically it is a 1940's house in original condition which we have gutted and are renovating.

    We are currently about halfway through, plaster is all hung, but I am a bit stuck about which order we should go about doing things in the bathroom.

    We have had everything re-plumbed, so the bathroom is fully roughed in. We had to replace / re-inforce some of the joists in the sub floor, and have just got the cement sheeting layed and the plastering has been done.

    My father in law wants to water proof and caulk (he has some experience in this) but we are getting a professional tiler in.

    Do we waterproof now, before tiling and screeding? or after?

    You can waterproof before or after screeding, some prefer to waterproof before screeding is the screed then protects the membrane, however this have an effect on the drainage so if the floor slopes seal it after screeding,

    Also note that if waterproofing before screeding the waste pipe above the waterproofing must have slots cut in the sides to allow drainage at the floor level. This reduces mould.


    Also, we will be installing a frameless shower screen, are these installed before tiling or after?

    Not only are they installed after tiling but should be purchased after tiling as well, this way they can be 'made to fit' thus avoiding the armatures gap.

    Sorry if these are really stupid questions, although we have learnt a lot over the past 8 months we are still total newbies compared to some!

    thanks for reading

    Maryanne
    Hope this helps.

    Good luck.
    Growing old is compulsory, growing up is not.
    http://www.wet-seal.com.au/waterproofing/locations.html

  4. #4
    PVS
    PVS is offline
    Member
    Join Date
    Mar 2010
    Location
    Melbourne
    Posts
    60

    Default

    Thanks guys....this helps immensely!!!

    Sounds like it may be best to waterproof after screeding...and it makes sense now that the shower screen gets installed after tiling...thankyou

  5. #5
    3K Club Member
    Join Date
    Jun 2010
    Location
    Qld
    Posts
    3,278

    Default

    Be sure to continue the waterproofing down and into the waste to eliminate any moisture getting under the screed.

    Good luck.
    Growing old is compulsory, growing up is not.
    http://www.wet-seal.com.au/waterproofing/locations.html

  6. #6
    PVS
    PVS is offline
    Member
    Join Date
    Mar 2010
    Location
    Melbourne
    Posts
    60

    Default

    Thanks for the extra tip

    My father in law is doing the waterproofing...I will be sure to pass it on!

Similar Threads

  1. Painting in what order ?
    By devo2006 in forum Painting
    Replies: 18
    Last Post: 18th Jan 2011, 08:14 AM
  2. tiling order
    By rhysvando in forum Tiling
    Replies: 3
    Last Post: 19th Nov 2009, 08:50 PM
  3. How much roadbase to order?
    By tony2096 in forum Paving
    Replies: 9
    Last Post: 9th Feb 2009, 09:47 PM
  4. In what order should it all be done?
    By Pollyanna in forum Structural Renovation
    Replies: 32
    Last Post: 29th Jan 2009, 08:42 PM
  5. Order in which to do things...
    By Just George in forum Pergolas, Gazebos, Strombellas & Rotundas
    Replies: 1
    Last Post: 28th Nov 2008, 07:52 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •