    Default how long to wait after tiling

    Hello all,
    I am going to replace some tiles in my shower as the ones there are coming off and I want to replace some of these before there is any water damage to the board. If I replace these on the weekend (say the sat) and grout on the sun, when would you say we would be able to use the shower again?

    Thanks
    whippee

  2. #2
    Golden Member m6sports's Avatar
    Join Date
    Feb 2009
    Location
    NSW
    Posts
    624

    Default

    24 hours

  3. #3
    Banned
    Join Date
    Mar 2010
    Location
    India
    Posts
    36

    Default

    It depends on stickiness of the tiling. The minimum time is 24 hours and the maximum is 48 hours.

Similar Threads

  1. After reblocking, should you wait for sometime before re-plastering?
    By buzzlightyear in forum Structural Renovation
    Replies: 1
    Last Post: 6th Jan 2010, 03:03 PM
  2. Long hot dry summer
    By OBBob in forum Flooring
    Replies: 0
    Last Post: 8th Jan 2008, 04:44 PM
  3. acclimatisation- for how long???
    By cheeky0_10 in forum Flooring
    Replies: 3
    Last Post: 15th May 2006, 09:52 PM
  4. how long ???
    By Zedd in forum Books, Videos & Plans
    Replies: 6
    Last Post: 30th Nov 2005, 12:13 PM
  5. I've come a long way
    By DaveInOz in forum Feedback & Help
    Replies: 2
    Last Post: 25th Jun 2004, 07:41 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •