What's going on the slab? Is it going to have vehicle traffic? How big is it? My advice is to be more concerned with footings than the subbase, just 100mm of clean sand or crusher dust will be fine for that. Yes, it should be compacted, although this is much easier with sand as you only need a hose and a vibrating plate compactor. The crusher dust should be done with a Wacker Packer or a roller, preferably vibrating. If the underlying soil is the natural material (not controlled fill compacted in layers), you may need some thickening beams to prevent the slab from cracking with soil movement. There is also the issue of subsurface drainage, to make sure that the soil under the slab doesn't get constantly wetted and dried.Originally Posted by untamed