Is there a AS for joining of slabs/concrete footings? I have a strip footing and a standalone 450x450 pier. I look like putting a raft slab (edge beam) in between and min 150mm above them so do I need to join them by "Y"bars before putting the raft slab in? say at the trench mesh level and the slab fabric level?