    Dear all,

    recently got a mail saying premium feed in tariff will soon be at its limits (100MWh installed in VIC) and from than on you get the fair price, feed in same as take out (pretty fair, ay, since private people put in infrastructure which the govt should have).
    Is that true, still saving up to get the roof fixed, before I get the panels up?

    Thanks,

    Steffen

  2. #2
    HOW MUCH??? mcsmart's Avatar
    Join Date
    Jun 2011
    Location
    Western Suburbs -Adelaide
    Age
    58
    Posts
    64

    Default

    Hopefully, if they go down this road, they do as they have just done in SA. That is you need to buy the unit prior to Oct 1, then you have 120 days to make a date for the electricity supplier, for us ETSA, to install/change/reprogram your meter. You do not have to have the system installed or connected.
    I am in the same situation as you where I will not have a roof to fit the panels to until after March 1 (I hope I will be close). Now all I have to do is sweat off on ETSA playing the game and provide me with a date, this will be the tricky bit.
    Surprisingly, when I was trying to find a solar panel provider that I wanted to give 10 grand to, none of them had any idea of what the new legislation meant.
    I finally found a supplier who explained the legislation to me and then I researched the legislation and spoke to Govt agencies to ensure he was right, and he was. I wanted to give my cash to that company but they were 2 grand more than Origin who I eventually went with, once I explained the new rules to them.
    Last edited by mcsmart; 31st Jul 2011 at 09:58 PM. Reason: spelled rong

  3. #3
    Old Chippy 6K
    Join Date
    Mar 2007
    Location
    Canberra
    Age
    69
    Posts
    6,561

    Default

    See here: Feed-in Tariffs - Department of Primary Industries amd you can sign on to get updates
    Advice from me on this forum is general and for guidance based on information given by the member posing the question. Not to be used in place of professional advice from people appropriately qualified in the relevant field. All structural work must be approved and constructed to the BCA or other relevant standards by suitably licensed persons. The person doing the work and reading my advice accepts responsibility for ensuring the work done accords with the applicable law.

  4. #4
    Senior Member
    Join Date
    Jun 2008
    Location
    Melbourne
    Posts
    431

    Default

    Quote Originally Posted by Steffen595 View Post
    recently got a mail saying premium feed in tariff will soon be at its limits (100MWh installed in VIC)
    i bet this "mail" is from someone with a vested interest? e.g. a PV solar company?
    call that "marketing" and give it the attention it deserves.

    DPI or energy retailers are NOT sending out any such material AFAIK.

    Quote Originally Posted by Steffen595 View Post
    and from than on you get the fair price, feed in same as take out (pretty fair, ay, since private people put in infrastructure which the govt should have).
    Is that true, still saving up to get the roof fixed, before I get the panels up?
    the Net PFIT in Victoria scheme is capped at 100MW of installed capacity.

    the 'belief' from those that have been following it is that it will reach capacity somewhere between August and December this year.
    it may be sooner rather than later because of the reduction in RECS multiplier in the first 1.5KW of the system that came in on June 30 probably accelerated a lot of installs before the end of the financial year.

    the scheme works that in order to qualify for the Net PFIT you must have all of: 1. PV system installed, 2. CES/EWR paperwork & PFIT application submitted to your retailer, 3. retailer having scheduled a bidirectional meter changeover with distributor, 4. distributor HAS changed the meter done BEFORE the programme ends.

    the time it takes for (2)/(3)/(4) is typically 30 working days (sometimes more depending on which distributor you are with), so reality is that unless you're a gambling person it may already be too late to instigate a PV solar system and expect to get on the Net PFIT setup.

    the Net SFIT will however continue to operate, that scheme is not about to end.

    depending on what size system you were thinking about, the reality is that unless you're going for a system of (say) 3KW+ it may well be that the 'difference' between the net PFIT and SFIT is negligible anyway as the 'net' part of it (unlike the 'gross' that was the trainwreck in NSW) significantly caps what benefit you can get from it.

  5. #5
    Senior Member
    Join Date
    Mar 2011
    Location
    Preston
    Posts
    169

    Default

    "SFiT – This plan offers to pay you for the electricity you feed back into the electricity grid, over and above what you use at home, at the same rates as you pay to purchase electricity under your current electrical services contract. The plan is available for electricity generated from any renewable resource, such as the sun or wind."
    thats the one which will be applicable for ever, fair enough. But premium is gone, i.e.
    "PFiT – This plan offers to pay you for the electricity you feed back into the Victorian grid, over and above what you use at home, at a premium of $0.60 per kWh. Most electricity retailers in Victoria offer a premium of between $0.06-0.0"
    so it will take forever until the thing pays off. All I can get up is 1kW if lucky, weird shaped roof.
    Ah and yes, was newsletter from PV seller.

    Here is Bear Grylls on whats left of the glorious solar flagship

  6. #6
    HOW MUCH??? mcsmart's Avatar
    Join Date
    Jun 2011
    Location
    Western Suburbs -Adelaide
    Age
    58
    Posts
    64

    Default

    It looks like Bear must have killed the last Sumatran albino tiger for a paddle. Nice craftsmanship.

  7. #7
    Senior Member
    Join Date
    Mar 2011
    Location
    Preston
    Posts
    169

    Default

    Zebra it says, if I clearly remember. Hope its not sinking as fast as the Mc Collins class solar flagship.

    I figured, I am using 5kWh a day in average, thats what a 1kW system in average generates. So, would never get the premium tariff anyway....

  8. #8
    Senior Member
    Join Date
    Mar 2011
    Location
    Preston
    Posts
    169

    Default

    friend of mine gets billed monthly since he has his PV, suppose not bigger than 1.5kW. Family of 4. Still gets negative energy bills, so premium tarriff works for him.
    50 000 Victorian households profit from that sheme
    Premium Feed-in Tariff - Department of Primary Industries
    this is 2.8%. Already the scheme is finished. Reg the recent corparate greed thing: are already they scared of missing out because of so little of the population generate their own electricity? This is, per capita in the sunburnt country (so the say, rather coal burnt) there is 2.6 W of solar energy. Per capita in the not so sunburnt Germany 10 W.....

Similar Threads

  1. Premium Floors, ReadyFloor, White Oak
    By Flok in forum Flooring
    Replies: 0
    Last Post: 7th Sep 2010, 08:03 AM
  2. Anyone used 'Premium Aqua Gold'
    By jimbo_jones in forum Flooring
    Replies: 11
    Last Post: 30th Aug 2009, 06:55 PM
  3. RSS Feed - Test
    By ubeaut in forum Structural Renovation
    Replies: 1
    Last Post: 8th Nov 2008, 07:44 PM
  4. Premium
    By jit02 in forum Flooring
    Replies: 4
    Last Post: 30th Apr 2008, 10:43 PM
  5. Emptying gravity feed HWS ?
    By nic in forum Plumbing
    Replies: 4