Cost to lock up stage

Results 1 to 9 of 9
  1. #1
    Apprentice (new member)
    Join Date
    Jun 2007
    Location
    Melbourne
    Posts
    12

    Default Cost to lock up stage

    Just wondering how much it normally costs to get a brick-veneer 2 storey house up to lock up stage per m2 / sq.

    I was roughly quoted by a builder $200k for a 35sq custom home, excluding site cost and slab, as we're still waiting for soil testing to come back.

    Is this normal or excessive?

  2. #2
    Champion Messmaker Dirty Doogie's Avatar
    Join Date
    Aug 2007
    Location
    Noosa Heads
    Posts
    512

    Default

    Sounds very reasonable to me - 35 sq = 270 mtr2 I think! Actually its very cheap!

  3. #3
    Pretend my avatar moves! bitingmidge's Avatar
    Join Date
    Nov 2003
    Location
    "The Home of the Biting Midge" MountainCreek Qld
    Posts
    1,138

    Default

    supa,

    How many fingers am I holding up?

    Go on, take a guess!

    That's about what any response to your question will be worth, (sorry Doog no offence intended). There are so many variables between location, materials and what is or is not included that it's just not worth asking the question.

    For instance, there is no such thing as lock-up excluding site costs and slab, so any "normal" comparison is a waste of time.

    If you need a comparison to keep your builder honest, why not get a second quote?

    Cheers,

    P

  4. #4
    Apprentice (new member) Spooky's Avatar
    Join Date
    Oct 2001
    Location
    Manangatang
    Age
    62
    Posts
    7

    Default

    Like it or not supa, Midge is right. The true answer is impossible to give as there is nowhere near enough information.

  5. #5
    Golden Member
    Join Date
    Jun 2003
    Location
    ......
    Posts
    663

    Default

    Quote Originally Posted by bitingmidge View Post
    There are so many variables between location, materials and what is or is not included that it's just not worth asking the question.
    Midge, don't forget to include the other variables, like what suburb it will be built in, what suburb and house you currently live in and what car you have in the driveway when your builder calls.

    The BMW tax applies with most builders.


    Peter.

  6. #6
    Senior Member
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    346

    Default

    It would be like asking how much is a new 4 door sedan?

  7. #7
    Senior Member
    Join Date
    Mar 2005
    Location
    Melbourne
    Posts
    217

    Default

    Back to the important question - I reckon 2 (the salute maybe). How did I go Midge?

  8. #8
    Champion Messmaker Dirty Doogie's Avatar
    Join Date
    Aug 2007
    Location
    Noosa Heads
    Posts
    512

    Default

    Well I dont think the figure of 200k is entirely meaningless - I'm assuming the builder has looked at the plans. Lockup stage is only 35 - 45% of the cost of a new house. I think it is the easy bit and generally its the part builders make most money on LOL.

    Lockup stage means the building is weathertight, structurally complete and can be shut up but actually doesnt include locks. There are no internal wall coverings, ceilings or even ceiling battens, no external painting, no electrics. no plumbing. No staircases. no polished floors or tiles or any prime cost items. To give a price on that is pretty easy.

  9. #9
    Apprentice (new member)
    Join Date
    Jun 2007
    Location
    Melbourne
    Posts
    12

    Default

    Sorry about the vagueness of the question, but as Doogie said, it's just a weathertight shell. I thought that's the least variable part of the building process (excluding site and foundation cost), therefore the most constant cost that can be worked out per m2.

    The reason I asked is that I'm going to build with insulated concrete form (Zego) and that's not mainstream. I prefer that my builder is familiar and knows how to build with it, and there aren't that many around. So, I've got 1 quote only so far and trying to find other builders for quotes.

    Knowing this, what do you guys think about ~$5k / square for lock up?

    Any guess appreciated.

Similar Threads

  1. Help with constructing a stage
    By shamusot00le in forum Sub Flooring
    Replies: 2
    Last Post: 26th Jan 2008, 02:35 PM
  2. Damage to Building work (frame stage)
    By TallStreak in forum Structural Renovation
    Replies: 5
    Last Post: 15th Aug 2006, 08:04 AM
  3. Cant get new lock to lock or close from the outside
    By Geno in forum Doors, Windows, Architraves & Skirts
    Replies: 3
    Last Post: 13th May 2006, 02:46 PM
  4. Help with stage one... time periods
    By TuRb0 in forum General Odds & Sods
    Replies: 4
    Last Post: 4th Apr 2006, 09:57 PM
  5. Sand & Polish at what stage?
    By vGolfer in forum Flooring
    Replies: 14
    Last Post: 25th Nov 2005, 06:47 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •