28th Jun 2022, 02:17 PM
We live in a renovated steel portal shed. All plaster lined and quite nice. There seems to have been a lot of movement in the ground in the last 12 months resulting in cracked joins everywhere. Question today relates the the join between the ceiling panels. The roof is gabled and the interior panels follow the gable shape. How do we redo the join between the two panels to prevent the cracking in future?
S