Thanks.
Type: Posts; User: Maginty
Thanks.
Fair enough...thanks
I am required to provide the following to my certifier ...
“ Require certification from a qualified pest controller to the effect that termite protection measures have been implemented into...
thanks for the advice..I’ll check the CC. A website I found tonight was calling it “Final Identification Survey Report” ...same thing I guess.
cheers for that.
Just preparing to hire someone for my final survey to get certification for my large renovation. (Owner builder)
The certifier said that we need to show that we have built inside the setbacks...
Yes the roofer says it’s 55 mil with reflective anticon backing as you described. Thank you very much for your advice and for making sure that he’s giving me the right stuff... really takes the...
Thanks a lot for the reply... that makes a lot of sense. I’m currently contacting my roofer for him to specify as on the quote he says “standard wool blanket”. I will keep you in the loop !
...
I have the roofers soon to put on colourbond and it occurred to me, do I need to put that reflective sarking on the roof as well? Or is that only necessary if you don't have bulk insulation bats put...
I am currently cladding with fibre cement boards and for most parts I have battened out (10 mil) between the wall wrap... however there are some sections with braceboards.
Is there really any...
Ok. That Makes sense...good to know I’m not barking up the wrong tree! Cheers.
Just a quick disclaimer that I will not be attempting any of this work myself. I am merely trying to educate myself on the possibilities before paying for a plumbers time
I am replacing my roof...
Thanks for you efforts onthis. Appreciated. I chatted with the rep again and confirmed the live load was within spec. Scyon should add rigidity in terms of localised defection effecting the tiles.
...
Continuous span if I’m right. Sits on 3 bearers ....those red lines are the bearers that continue another 5m.
120951
I will be using 90 x 70’s ...less timber then ripping and laminating ..I’ll use my leftovers for lintels
ta.
Cheers for that. I ended up consulting with the engineer who supplies my timber and went with 90 X 70 at 300 centres.
Thanks everybody for your input and advice , much appreciated. I have...
Will do.. thanks for your help. What you r seeing in the photo is all 6 joists stacked sideways.
70 x 130
...the area in question
https://www.renovateforum.com/attachments/f203/120937-making-wet-area-tiles-flush-flooring-inkedimg_2556-6760-_li.jpg...
https://www.renovateforum.com/attachments/f203/120932-making-wet-area-tiles-flush-flooring-capture2.jpghttps://www.renovateforum.com/attachments/f203/120933-making-wet-area-tiles-flush-flooring-captur...
Thanks every one for the input..
so the consensus is a single 130 x 40 joist, notched..partnered with a notch in the bearer ? ta
Good point, I could pop a few more unipiers in.. New to the forum don’t know how to post pics
Makes sense but good to hear the science is right...just putting the last of the particle board on now ..so no wall frames up..(it’s an extention) Those 3.6 sheets make it hard work. I will be going...
Thanks Phild01, just wrapping my head around your advice ! Might get back to you to confirm I understood the concept. Appreciated
Gotcha. Still working on doing photos but it is continuous...ie The joists sit on 3 bearers... Maximum span is 2300…
Hey guys..thanks for fast reply’s. 450 centres.. not sure what you mean about single/continuous span. The joist is 40 x 130 LVL so a sister LVL joist would have to be 40plus x 90 if I understand it...
I am laying the last of my joists today and in my laundry area an idea has been put forward to notch 45mil off the 130 mil joist so my tiles can be flush with the finished adjacent flooring. Sounds...
Thanks for the heads up !
Great and thanks.
Hey guys, just wondering if there’s a preferred right side up for yellow tongue in relation to the wax coating ? One side has some printing from the mill on it. Ta.