Search:

Type: Posts; User: jimfish

Search: Search took 0.02 seconds.

  1. Replies
    38
    Views
    14,981

    Decking Posts - What's the best method?

    We have never filled the holes with concrete,only a 200 mm pad at the bottom. To the best of my knowledge it wasn't recommended to fill the entire hole with concrete unless steel stumps were used....
  2. Replies
    38
    Views
    14,981

    Decking Posts - What's the best method?

    With concrete stumps it's generally a 2 person job, put a pad of concrete in the bottom of each hole then one person holds the stump to a string line set 20 mm high while the other person backfills...
Results 1 to 2 of 2